Finalized projects

2010

• Geotechnical study: “Road construction/modernization from DJ 208H – Balş Monastery to DN 28B, (≈22 km length) (construction/modernization of the access road towards Balş Monastery in order to include it in a round-trip)”
• Geotechnical study: “DJ 294B road modernization, Stefanesti-Murguta- Dobarceni, km 2+400 – 13+010”
• Geotechnical study: “Bitumen modernization of DC15 road, Aroneanu-Dorobant, section II, km 0+900 – 3+600”

2009

• Geotechnical study: “Creating and developing the infrastructure from Pirgaresti commune, Bacau district”;
• Modernization of DC128 road (Paraul Boghii-Tuta-Tg.Trotus), DC129 road (Nicoresti-Bogdanesti, Pirgaresti commune, Bacau district);
• Integrated system of water alimentation, sewerage system, filtering station, Pirgaresti commune, Bacau district;
• Geotechnical study: Building assemblage constructions: B+GF+M+9S, B+GF+M+8S and B+GF+M, Suceava intravillan, Suceava district;
• Geotechnical study: “Efficient system for residual management” in Flamanzi town and in Frumusica, Copalau, Prajeni, Cosula communes, Botosani district;
• Geotechnical study: “Setting sewerage system and filtering station for domestic waters from Cozia village, Costiuleni commune, Iasi district”, and building a daily assistance P regime center according to the “after-school” program in Costiuleni commune, Iasi village;
• Geotechnical study: “Building carrying station for waste products and selective collecting system in the area of Roznov town, Neamt district”.

2008

• Geotechnical study: “Arrangement of Ciric Park”, Iasi city, Iasi district.